{"id":4673,"date":"2010-12-27T06:00:49","date_gmt":"2010-12-27T12:00:49","guid":{"rendered":"http:\/\/www.discoverclarksville.com\/articles\/?p=4673"},"modified":"2010-12-27T03:27:50","modified_gmt":"2010-12-27T09:27:50","slug":"on-site-construction-workforce-reaches-1150-at-hemlock-semiconductor-facility-in-clarksville","status":"publish","type":"post","link":"https:\/\/www.discoverclarksville.com\/articles\/2010\/12\/27\/on-site-construction-workforce-reaches-1150-at-hemlock-semiconductor-facility-in-clarksville\/","title":{"rendered":"On-site construction workforce reaches 1,150 at Hemlock Semiconductor facility in Clarksville"},"content":{"rendered":"<p><span style=\"color: #000080;\"><em><strong>Training Underway for Production Operators Who will Operate Plant<\/strong><\/em><\/span><\/p>\n<p><strong><a target=\"_blank\" href=\"http:\/\/www.clarksvilleonline.com\/wp-content\/uploads\/2010\/10\/hsclogo.gif\"  class=\"thickbox no_icon\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-thumbnail wp-image-49897\" title=\"HSC Logo\" src=\"http:\/\/www.clarksvilleonline.com\/wp-content\/uploads\/2010\/10\/hsclogo-200x66.gif\" alt=\"Hemlock Semiconductor Corporation\" width=\"200\" height=\"66\" \/><\/a>Clarksville, TN<\/strong>. &#8211; 1,150 construction workers are currently  employed at the <a target=\"_blank\" href=\"http:\/\/www.hscpoly.com\/\" >Hemlock Semiconductor, L.L.C.<\/a> site in Clarksville, with  the on-site construction workforce expected to peak at approximately  1,500 workers by mid-2011. Hemlock Semiconductor is building a $1.2 billion facility to manufacture polysilicon, the  cornerstone material for solar cells.<\/p>\n<p>\u201cWe have carpenters, electricians, pipefitters, welders and many  more craft persons working on our site,\u201d said Jim Russo, project  director, Hemlock Semiconductor, L.L.C. \u201cWe are constantly awarding new  contracts and creating jobs.\u201d<\/p>\n<div id=\"attachment_58961\" style=\"width: 490px\" class=\"wp-caption aligncenter\"><a target=\"_blank\" href=\"http:\/\/www.clarksvilleonline.com\/wp-content\/uploads\/2010\/12\/IMG_9858.jpg\"  class=\"thickbox no_icon\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-58961\" class=\"size-medium wp-image-58961 \" title=\"An aerial view of the Hemlock Semiconductor construction site. Photo taken in October 2010\" src=\"http:\/\/www.clarksvilleonline.com\/wp-content\/uploads\/2010\/12\/IMG_9858-480x320.jpg\" alt=\"An aerial view of the Hemlock Semiconductor construction site. Photo taken in October 2010\" width=\"480\" height=\"320\" \/><\/a><p id=\"caption-attachment-58961\" class=\"wp-caption-text\">An aerial view of the Hemlock Semiconductor construction site. Photo taken in October 2010<\/p><\/div>\n<p><!--more--><\/p>\n<p>Russo says the construction workforce changes frequently as the  work is spread among many different contractors, giving more people the  opportunity to work on the project. Information about available  construction jobs is available through the <a target=\"_blank\" href=\"http:\/\/www.tennessee.gov\/labor-wfd\/cc\/cccounty_files\/montgomery.htm\" >Montgomery County Career Center<\/a>. Visit <a target=\"_blank\" href=\"http:\/\/www.hscpoly.com\/\" >hscpoly.com<\/a> to learn about contracting  opportunities.<\/p>\n<p>Construction began in November 2009 and is expected to continue into  2012, with the plant scheduled to begin operations in late 2012. The  company plans to open the Solar Center, where administrative offices  will be located, in late spring of 2011. Work on infrastructure such as a rail spur, water tank and power lines is underway.<\/p>\n<p>Hemlock Semiconductor is also rolling-out a training program for  production operators, who will represent the backbone of the  manufacturing workforce and largest number of the 500 full-time  positions at the Clarksville site. The first group of ten production operators began training in mid-November, with a regular schedule of  hiring and training for production operators continuing through 2011.<\/p>\n<p>Training for production operators consists of a combination of  hands-on training at the Hemlock Semiconductor site in Michigan and  classroom work in areas such as high-performing teams, creative thinking  and safety. While in training, production operators work one week in Clarksville followed by three weeks in Hemlock,  Michigan, for a total of thirty weeks.<\/p>\n<p>\u201cAt the end of thirty weeks of training, these team members will be  qualified to operate the plant,\u201d said Brian Amick, Clarksville Site  training manager for Hemlock Semiconductor, L.L.C.<\/p>\n<p>Job openings and qualifications are posted at hscpoly.com and will  be continually updated as hiring continues into 2012. In addition to  production operators, available positions include degreed and  experienced chemical, electrical, and mechanical engineers; and skilled trades such as instrumentation and pipefitting\/welding.  Resumes must be submitted online.<\/p>\n<h3>About Hemlock Semiconductor Group<\/h3>\n<p><a target=\"_blank\" href=\"http:\/\/www.clarksvilleonline.com\/wp-content\/uploads\/2010\/10\/hsclogo.gif\"  class=\"thickbox no_icon\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-thumbnail wp-image-49897\" title=\"HSC Logo\" src=\"http:\/\/www.clarksvilleonline.com\/wp-content\/uploads\/2010\/10\/hsclogo-200x66.gif\" alt=\"Hemlock Semiconductor Corporation\" width=\"200\" height=\"66\" \/><\/a>The Hemlock Semiconductor Group  (hscpoly.com) \u2013 Hemlock Semiconductor \u2013 is comprised of two joint  ventures: Hemlock Semiconductor Corporation and Hemlock Semiconductor,  L.L.C. The companies are joint ventures of Dow Corning Corporation, Shin-Etsu Handotai and Mitsubishi Materials  Corporation. Hemlock Semiconductor is a leading provider of  polycrystalline silicon and other silicon-based products used in the  manufacturing of semiconductor devices and solar cells and modules. Hemlock Semiconductor began its Michigan operations in 1961 and  broke ground at its Tennessee location in 2009.<\/p>\n<p>HSC and HEMLOCK SEMICONDUCTOR are trademarks of Dow Corning Corporation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Training Underway for Production Operators Who will Operate Plant Clarksville, TN. &#8211; 1,150 construction workers are currently employed at the Hemlock Semiconductor, L.L.C. site in Clarksville, with the on-site construction workforce expected to peak at approximately 1,500 workers by mid-2011. Hemlock Semiconductor is building a $1.2 billion facility to manufacture polysilicon, the cornerstone material for [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[3],"tags":[5900,5901,5902,5903,1057,5904,5905],"class_list":["post-4673","post","type-post","status-publish","format-standard","hentry","category-business","tag-brian-amick","tag-hemlock-mi","tag-hemlock-semiconductor-l-l-c","tag-jim-russo","tag-jobs","tag-montgomery-county-career-center","tag-polysilicon"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_shortlink":"https:\/\/wp.me\/p4xGYI-1dn","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/posts\/4673","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/comments?post=4673"}],"version-history":[{"count":1,"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/posts\/4673\/revisions"}],"predecessor-version":[{"id":4674,"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/posts\/4673\/revisions\/4674"}],"wp:attachment":[{"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/media?parent=4673"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/categories?post=4673"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.discoverclarksville.com\/articles\/wp-json\/wp\/v2\/tags?post=4673"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}